Flip 360 Commission Platform
Workstream Drill-down · WS3 of 7

WS3 · Founder Capability.

Lead: Mathew Punter (coachee) · Carla Oliver (coach)  ·  Provider: CoSai  ·  Current state: Scoped

Live board Workstream ops Registers Steerco papers Scoping · CRM CRM · user requirements Deal room Hardening backlog Learn (ADKAR) Framework
WS1WS2WS3WS4WS5WS6WS7
Source Vol 4 Ch 12 · PMO Structure · the six workstreams  |  Vol 4 Ch 13 · Engagement Terms & Ways of Working

1  ·  Current state & lifecycle

Scoped · Work defined: what gets built, by whom, by when, to what acceptance test.
Pending
Scoped
Built
Live

2  ·  Transition history

Every state transition this workstream has made. Each row carries the trigger event that caused the transition — the single sentence that justifies the state change.

DateTransitioned toTrigger
1 March 2026 Pending scope Workstream named in Vol 4 Ch 12 · founder-capability seat designed in operating model
23 May 2026 Scoped Coaching cadence locked (weekly Founder 1:1 per framework §6) · coach seat filled (Carla) · curriculum to be drafted in Phase 1

3  ·  PMO commentary

PMO Director · Carla Oliver · WS3

WS3 is the workstream that runs on Carla's coaching capacity — included inside her CoSai retainer, not a separate line item. At engagement signing it is Scoped: the cadence is defined (weekly Founder 1:1 in framework §6), the coach seat is filled, but the curriculum itself is not yet drafted. Phase 1 work is to draft the 12-dimension founder-readiness curriculum by Steerco #3, teach it through Steerco #5, and have a self-operating Mathew by the time WS3 transitions to Implemented at G4. This workstream advances by two state transitions during Phase 1 — the most movement of any workstream — because it starts furthest left.

4  ·  Phase 1 / Phase 2 deliverables

Phase 1 · 1 Jun → 31 Aug 2026

Founder-readiness curriculum drafted (12 dimensions). First quarterly checkpoint demonstrates measurable founder advancement. By G4, Mathew operates board cadence independently and runs investor calls solo.

Phase 2 · 1 Sep 2026 → 30 Jun 2031

Ongoing weekly Founder 1:1 as standing forum. Quarterly capability review at QBR. Annual founder-readiness review at Board meeting.

5  ·  Phase 1 milestones

The build-out plan for this workstream across the 13-week Phase 1. Each row reviewed at the relevant Steerco. Where the milestone triggers a state transition, the new state is shown.

WeekSteercoMilestoneMoves WS to
W2 #1 Founder readiness model agreed · 12 capability dimensions ratified No state change
W6 #3 90-day coaching curriculum drafted by Carla · Mathew reviews + accepts → Built
W10 #5 First quarterly checkpoint · founder advances on each of the 12 dimensions No state change
W12 #6 WS3 enters Phase 2 with curriculum live · ongoing coaching as BAU → Implemented

6  ·  KPI architecture

KPI categoryFounder readiness (qualitative · Steering-assessed)
ExamplesPitch deck reviewed by 2 fintech operators · investor calls run solo · board-meeting cadence operated independently
Volume / Chapter sourceVol 1 Ch 4 (RACI · founder accountability) + Vol 3 Ch 1-3 (Carla SoW T&Cs)

7  ·  Cross-workstream interfaces

How this workstream supplies and consumes from the other six. Reading these interfaces is how you read the operating model end-to-end.

PartnerSupplies to partnerConsumes from partner
WS7 Investor-pack content · Mathew is the principal IR voice (coached by Carla)
WS6 Partner-onboarding learning · each new vertical onboarded teaches the founder operating muscle

8  ·  Physical artefacts in the repo

Every artefact that exists today as evidence this workstream is at the claimed maturity. 3 routes.

RouteDescription
/for-mathew Founder briefing pack · principles, fears, structural argument
/business-case Editable business case · autosaves to D1 via /api/business-case/save
/engage The 12 T&Cs · IP regime · operating principles Mathew is contracting to

9  ·  Bottom-up evidence-based status reports

No bottom-up status reports have yet been compiled for WS3. The PMO authors these approximately 5 working days ahead of each Steerco — see the WS2 example at /engagement/pmo/ws-status/WS2/2 for the format Carla and the workstream leads use.


WS2 Live PMO board Framework §3 block WS4